Sign In | Join Free | My chinacsw.com
China Daoyunai Energy Saving Technology Limited logo
Daoyunai Energy Saving Technology Limited
Committed to underground pipeline CIPP and CCTV
Verified Supplier

4 Years

Home > UV Cured CIPP >

Rehabilitation UV Cured CIPP Relining For Urban Pipes Repair Cipp Pipe Repair

Daoyunai Energy Saving Technology Limited
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Rehabilitation UV Cured CIPP Relining For Urban Pipes Repair Cipp Pipe Repair

Brand Name : DAO

Place of Origin : Jiangsu, China

MOQ : 60m

Price : Variable

Payment Terms : T/T

Supply Ability : 220 km per year

Delivery Time : 15 working days

Packaging Details : Normal

Material : UV light

Diameter : DN500

Thickness : 6mm

Length : 360m

Weight : Variable

Life : 50 years

Contact Now

UV cure product for urban pipes service and repair by no excavation process

UV CIPP curing trenchless repair:

UV curing uses UV light as the curing medium. The resin contains a photoinitiator. When irradiated by UV light of a specific wavelength, the resin will produce a curing reaction to form a new high-strength lined pipe. The installation method is mainly pull-in type, which is applicable to drainage pipes of various shapes with a pipe diameter of 150mm~1600mm. During construction, the windlass is used to pull the glass fiber inner liner filled with resin into the existing pipeline, and the inner liner is "blown" by a large flow fan, and then clings to the inner wall of the existing pipeline. After solidification, the pipeline can not rely on the original pipeline, and can independently bear internal and external pressure. The repaired new pipe will not affect the water flow section, and the normal service life is more than 50 years.

UV curing repair process:

(fixed binding head) (sent to lamp rack) (UV curing) (repaired pipe)

UV curing repair features and advantages:

◆ little impact on traffic, etc. Trenchless lining repair without excavation of work pit;

◆ good construction controllability and short construction period. The whole curing process is monitored by CCTV, and the pulling in and curing can be completed in only 3 to 4 hours;

◆ energy saving and high security. UV curing is adopted, with low energy demand. No water or steam curing is used at the construction site, and no toxic gas or other harmful substances are produced;

◆ the inner liner has a good sealing effect, strong corrosion-resistance, and long service life;

◆ high mechanical strength can be achieved under small thickness to reduce the current carrying loss of pipe diameter;

◆ high bending elastic modulus, bending, and tensile strength;

◆ many domestic and international authoritative quality certifications.

How CIPP
Application Storm
Length Any length is possible

Rehabilitation UV Cured CIPP Relining For Urban Pipes Repair Cipp Pipe Repair


Product Tags:

Rehabilitations UV Cured CIPP DAO

      

UV Cured CIPP Relinings DAO

      

relinings cipp DAO

      
Quality Rehabilitation UV Cured CIPP Relining For Urban Pipes Repair Cipp Pipe Repair for sale

Rehabilitation UV Cured CIPP Relining For Urban Pipes Repair Cipp Pipe Repair Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Daoyunai Energy Saving Technology Limited
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0